Strategic
Planning Committee
Updates
June,
2011
Year Four of the five-year Strategic Plan
has been completed. A total of twenty-three possible projects were studied by
the Curriculum, Personnel and Facilities committees. Following are
the findings of those committees:
Curriculum
Committee
1. Restructuring
Band and Chorus Time
From the
Winter Concert in December to the Spring Concert in May, our students have
provided entertainment while putting their talents on display for parents,
friends, peers and the McKeown stakeholders, in general.
As all of us are aware, it is quite difficult and time-consuming to find enough
time both during the school day and after school to ensure a successful
concert.
With that thought in mind, the Curriculum Committee investigated whether or not
restructuring of both band and chorus time during the school day would give our
students the opportunity that they needed to reach their full potential and
talent in music.
The committee may consider studying other options that exist outside of the
school day in order to restructure the band and chorus times to optimize
instruction for the majority of students. For the present time, however, band
and chorus times will remain as they currently exist.
2. Increase
in Recess Time
The committee
was given the task of looking at the possibility of increasing the school’s
recess time. It was found that students at McKeown School may have a 15 minute
daily-assigned recess, but that does not restrict them indoors for the
remaining time. The staff does a wonderful job in integrating the curriculum,
while at the same time making use of our wonderful al fresco environment. In addition, the recess time of 15 minutes
on a daily basis is equal to, and, in some cases, better than, the recess time
allotted by schools in our surrounding districts.
At this time, we will not increase the district’s recess time.
3. Instituting
a Late Bus
In an effort
to increase the number of students currently participating in after school
activities, the committee was asked to investigate the possibility of providing
a late bus for our students so that more students may participate in school
activities.
While middle schools and high schools typically provide late buses for their
students, it is not that straightforward when dealing with our young elementary
school students. As such, the committee found that:
a. Several community stops must be designated to service the entire township.
As such, students need to understand that they are to wait for someone, known
to them, to pick them up. Adults picking up these children must be responsible
in knowing when and where to pick up these students.
b. Inclement weather poses another
problem. Young children easily can be upset when being exposed to the elements.
c. After school transportation comes
with a price tag.
These issues must be considered
when discussing the possibility of providing bus transportation to students for
after school activities. The committee will
continue to investigate whether or not providing after school
transportation
is viable.
4. Creating
Family Math Night
The
committee was given the task of creating ideas that would extend the learning
opportunities, during and after the school day, for our students. One
suggestion was to offer Family Math Night
for parents. This night would be dedicated to educating parents on the
basic information that is pertinent to a particular grade. For example, regrouping, introduced in grade three,
is a term known by parents as borrowing.
Parents would be able to leave the night with a reference packet of information
detailing some of the concepts learned during the session.
5. Career
Fair
Offering a Career Fair would present all of our
students with an opportunity to learn about a variety of careers, the skills
needed and the educational requirements necessary. It would expose students to
fields that they may not know exist and possibly inspire them to seek
additional information. A committee would be formed to work with the Sussex
County Chamber of Commerce, Sussex County Community College, local businesses
and McKeown parents to solicit participation in this fair.
6. Volunteer
Programs
The
committee was given the task of investigating the many ways in which volunteering currently is used and how
we can increase the number of volunteers for the future. Volunteers are an
integral part of our community as they support, mentor and enrich our students.
The goal of the committee is to invite our school stakeholders to become
involved with our students through these volunteer opportunities. Following are
some of the programs, currently in place, that are manned by volunteers:
a.
The
Page Turner Program
b.
After
school tutoring by members of the National Honor Society at Kittatinny Regional
High School
c.
Clean-up
of school grounds
d.
Environment
Day
e.
Drama
Day
f.
Jump
Rope for Heart
g.
TREP$
h.
An
overnight trip for our grade six students to Fairview YMCA Camp
i.
Fire
Prevention Day
The
committee has found that volunteerism increases when the opportunities are
flexible and the potential volunteers have a voice in their level of
commitment.
7. Differentiated
Instruction
The
committee was given the task of investigating the concept of Differentiated Instruction and how it
can be applied to classroom instruction in kindergarten through grade six. We
are quite aware that not all students are alike. As such, the concept of differentiated instruction allows our
students to possess multiple options for understanding concepts and making
sense of the ideas presented to them. Teachers need to be flexible in their approach
to teaching and to assessment. The curriculum and its presentation must be
adjusted to the learner rather than asking the learner to change in order to
accommodate the curriculum. Differentiated
Instruction is, therefore, based upon the concept that all instructional
approaches should be modified as a result of the individuality and diversity of
students in the classroom.
The committee found that differentiated
instruction is alive and well at school. Our teachers always take into
consideration the concepts of teaching to the various levels of the student.
With our Reading Street series and
the mathematics activities culminating in assessing students through a series
of Criterion Referenced tests,
students are able to learn critical thinking skills and problem-solving skills
at their own pace and within their different learning modalities.
8. After
School Tutoring
At Marian E.
McKeown Elementary School, teachers and students, alike, have been very
fortunate to be supported by a community and a Board of Education who have
turned their attention to providing after school tutoring and summer school
enrichment programs. Nearly every weekday evening, students can be found in
groups of two, three or four working side-by-side with a classroom teacher
beyond 4:00 pm. These sessions allow the student an opportunity to revisit a
skill, ask burning questions and receive instant praise for a job well done.
Nearly seventy students receive some form of tutoring after school. The numbers
are steadily growing.
While much of the development of our tutoring program continues to unfold over
the last few years, it is important to strive for improvement in this area. Our
hope is to see more emphasis on this topic since parental involvement time is
at a premium.
9. Weekly
Technology Lab Instruction
This
committee was given the assignment to investigate projects of study that could
be incorporated or were already incorporated into the Core Curriculum Content Standards by grade level that students
could employ in the classroom.
Students from every grade level visit the technology lab once a week. They have
mastered the use of the computer. Students are able to conduct searches using a
number of different research engines. Our students are avid users of Internet
search engines. In addition, our students are shown how to use the Smartboard,
the Smart Table and everything related to PowerPoint presentations.
10. Basic
Skills Restructuring
Basic Skills Instruction (BSI) is, quite possibly, the most
challenging of all topics researched by the Curriculum Committee. The committee
found that combinations of co-teaching and modified pull-out programs exist in the
classrooms. Strategies that have been deemed Best Practices have suggested that teaching accompanied by
high-stakes testing often requires students to be heterogeneously grouped in
order for students to understand what is required for success as they are
exposed to all challenges.
Computer-driven instruction through such programs as Study Island has been found to be quite beneficial. These tutorial
study programs are available online 24 hours a day and 7 days a week. Finally,
our teachers will continue to examine this topic more closely as they look to
shape the future with the new national
core content standards.
Personnel Committee
1. Bullying
and Social Aggression
The Hampton
Township School District has aggressively addressed the topic of reducing and
eliminating bullying and social aggression in our elementary
school by implementing the following concepts:
a.
Safe in School
A homegrown
slide show presentation that details the basic tenants of bullying and how to
stop it when it occurs. This program is discussed with students on a weekly
basis by homeroom teachers.
b.
Student Assemblies
Given by
such well-known speakers as Jim Jordan, our assemblies are designed to present
students with ways in which they must conduct themselves and how to work
towards eliminating the bullying issue. These assemblies have proven to be
quite productive. Students respond favorably to them.
c.
Stop Boxes
These boxes,
placed strategically around the school building, allow our students to provide
information, anonymously, on students exhibiting signs of social aggression.
Additional
resources are currently being explored as a new anti-bullying law has been signed and put into effect for New
Jersey. This law details ways in which bullying episodes are to be dealt and
the intense training that must be offered to all staff. As such, the committee
will continue to examine this topic.
2. Utilization
of Volunteers
Working in
conjunction with the work done by the Curriculum Committee, the Personnel
Committee has found that a program of this nature requires a part time
volunteer coordinator who could maintain a desk and a phone at a station in the
school building while organizing a host of valuable volunteer programs.
3. Technical
Support for Staff
As the
committee reviewed the use of technology, it was determined that teachers’
schedules demonstrate that more than 10 periods per week are designated as issues
dealing with hardware that require technical assistance. A total of 19 periods
per week are assigned to the direct instruction of the 19 homerooms in grades
K-6. In addition, the school employs a technology assistant who is hired on an
hourly basis. This assistant works three days per week solely to address
technical problems and new software concerns. This represents a huge amount of
time spent for the number of servers and computers that must be supported.
The new NJSmart database, currently being implemented in all schools across the
state of New Jersey by the Department of Education, requires an increase in the
time spent on data entry.
4. Building
Security
A main topic
of study for the Strategic Planning Committee has been that of building security. As a result, this committee
has worked on a number of different issues from the submission of an REMI stimulus grant, in conjunction
with Kittatinny Regional High School and the Hampton Township Municipal
government, to that of the development of an H1N1 flu virus control plan.
This committee is proud to report that, over the past three years, our PTA,
working in conjunction with our Board of Education, accepted the recommendation
of administration and financed a major portion of a $54,000 all-weather
playground. This asphalt playground has enabled the staff to take our students
off the roadway during winter recess. Students are now able to enjoy
basketball, four square, hop scotch and just getting some fresh air in a safe
location.
This committee does, however, recommend that the Board of Education pursue the
installation of speed bumps on School Road to reduce the access to the area
used by students for play. The committee also recommends the installation of
fencing that would control access to the playground by members of the public,
especially along the back parking area near the well house. The fencing would
give the staff additional time to identify security threats and would allow
additional time for staff and students to return safely to the school building
if, indeed, a threat were present.
The committee recommends the hiring of a school architect to assist with the
recommendation for fencing in strategic areas of our playground. Additional
recommendations involve the internal security of the front entrance to our building.
Facilities
Committee
1. Small
Group Instruction Rooms
The
committee was charged with the task of researching ways of providing
alternatives to our divided classrooms for small group instruction. At one
point in McKeown’s history, small group instruction was held in the front and
back corners of the library as well as in classrooms that had been
divided. While research shows that
in-class support should be used, if possible, there still remains the need for
time and space to allow instructors to work either one-on-one or in small
groups to develop the skills that can be conveyed in a small setting.
A professional architect, as well as the committee members, felt that the two
wings of the current McKeown library were under-utilized. The side extensions
containing the weather station and the professional collection as well as the
area in front of the current speech room are also areas that are under
consideration.
Classroom space for 8-10 students and a teacher could be created. The rooms
could be constructed of walls with opaque panels up to four feel high and clear
glass the remainder of the way up to the ceiling. Each room could have two
access doors. It is important to note that this construction would be much less
costly when compared to new construction, which would involve breaking ground
for new footings. The renovations have been estimated at $150 per square foot
and the walls could be removed if the original space were needed for another
configuration.
It is also the recommendation of the committee that an architect should be
formally obtained by the Board of Education for the 2011-2012 school year in
order to begin the formal planning stages of this project.
2. Instrumental
Music Room
Under the
direction of the current administration, the instrumental music program has
moved from a part-time arrangement to a full-time instructional opportunity. Of
course, with the increase in time comes the additional problem of finding space
to hold small groups of students.
This committee explored the possibility of creating a small classroom on the
stage and using the space behind the current music room as a small group
instructional area. The stage, although currently under-utilized, possesses
some of the greatest challenges to overcome. However, if created, the room
would be able to accommodate 5 students and an instructor. An upgrade in
lighting and flooring would be required along with the moving of one or two
walls.
A second consideration is the utilization of a recently-vacated classroom –
Room 300. This room is the former eighth grade gym office and shower room.
Sound-proofing the door separating the gym from this classroom would be
required.
It is advisable that the decision to create an instrumental music room be moved
to the forefront of the to-do list.
3. New
School Roof
The
committee was given the task of investigating all the possibilities of
improving and enhancing the school’s structure for the foreseeable future. One
possible enhancement is replacement of the current Carlisle Roll Roofing, which
is on the fringe of its life expectancy. We must weigh roof replacement against
continued repair and patching. Both the Board of Education and the community,
at large, asked that the use of solar panels be explored. This roofing would
then be considered replacement. The
new material would provide an increase in the R factor, better known as the insulation
factor.
To that end, members of the committee visited a new elementary school located
in Bridgewater, NJ. to examine the Modified
Bitumen Roofing System (MBRS) used in the construction of this school. Mr.
Scott Prisco, our guest architect, compared the Modified Bitumen Roofing System to the Carlisle Roll Roofing and stated that:
a. The MBRS is multi-layered and reinforced with polyester, fiberglass or
composite carriers.
b. The top layer of the MBRS contains modified bitumen top ply.
c. The roofing of the MBRS is fire resistant.
d. UV protection and a weather
protecting surface can be factory-applied to the MBRS, giving it a long life-expectancy.
e. The flashing around the roof
perimeter, equipment and projections is much improved. Given the location of
the school (middle of a field, susceptible to wind), the protection from the
elements would be greatly enhanced.
f.
The
R factor would assist in conserving
energy.
g. The estimated cost of removing
the old roofing, professional design of the new roof and installation of the MBRS is estimated at $17.25 per square
foot.
Replacing
the roof with MBRS is worth further
investigation. Roof replacement should be added to the list of items to be
reported upon by a professional architect during the 2011-2012 school year.
4. Solar
Panels Installation
This
committee has most enjoyed and appreciated the opportunity to examine the solar
energy component of the study the most since it is new, it is educational, it
is on the cutting edge and it has the greatest chance to produce a savings,
which can be translated into other opportunities for children.
Once again visiting the new elementary school in Bridgewater, NJ, the committee
found that the solar energy equipment installed in this school produced about
30% of the needed energy for the annual usage of the building. Several members
of the community then visited a Hampton residence where the entire home has
been powered by solar energy for over one year. The energy bills for this
residence have been quite favorable.
The research and quality of the equipment continues to improve. The impact of
the JCP&L offers and New Jersey’s Solar
Financing Program should be taken into consideration when studying the
possibility of utilizing solar energy.
5. Lockers
in the Fifth and Sixth Grade Classrooms (Unit III)
Over the
years, students leaving any elementary setting and moving on to a middle school
with more classrooms and hallways and further distances to travel usually have
a great level of anxiety prior to the actual transition. One of those fears
that student verbalize is the fear of dealing with lockers.
The committee conducted a walk-through of the Unit III wing. It was determined
that hallway lockers were out of the question due to the small size of the
hallways. However, coat closets, located in each classroom, could be converted
to a locker area. While the lockers would be half the size of the lockers
usually found in high school settings, these areas could accommodate two rows
of up to 13 lockers in each row. The wing, then, could house 160 lockers with
combination locks on them.
The committee has recommended that this item be added to the list of items to
be investigated and reported upon by a professional architect during the
2011-2012 school year.
6. Electric
Service Upgrade
The most
difficult part of examining an upgrade to the current electrical service is to
predict which direction technology will take in the next 10 to 15 years.
Currently, our school is at capacity
and further upgrades are needed. The following recommendations were made by the
committee after many hours of review:
a. Installation of two 75 KVA
transformers
b. Installation of two 42 CKT 3 PH
120/208 panels
c. Four QOB 230 breakers
d. Six QOB 220 breakers
e. Four QOB 120 breakers
The
estimated cost of the material and labor is between $17,000 and $18,000.
However, this electrical upgrade will allow our school to continue to add and
to upgrade power to each classroom as demand requires.
7. Electric
Generator
After
several reviews of our facility by electricians, architects and electric
company represents, we do not have a firm decision on the following items:
a.
Cost
b. Location of the generator on the
electrical service line coming into the building
c. Limitation
d. Alternative for powering just the
kitchen, cafeteria, gym and bathrooms in one wing.
While
the idea of a generator remains an excellent investment for emergency use,
there is not enough solid information available to make the decision to proceed
with this study. The topic, however, does require additional research.
8. Upgrade
Lobby and Main Office for Security
The
committee examined the concept of redesigning the front lobby and main office
to enhance the features of our present school security measures for the benefit
of students and staff. The discussions centered on renovations that would
include:
a. Installing a new door in the main
office
b. Placement of a counter to
separate visitors from clerical and staff
c. Placement of secretaries’ desks
behind the counter
d. Moving teachers’ mailboxes to the
copy room
e. Expanding the office area into
the current storage
f.
Re-assigning
administrative staff offices
g. Adding security locks with a switch
to the current office door
h. Installing electrical locks on
the inner lobby doors
i.
Enhancing
the security installation in the lobby near the front doors
The cost of the above enhancements has yet to be determined.
9. Additional
Parking Spaces
Members of
the community have suggested that consideration be given to increasing the
number of parking spaces in and around the school building. Additional parking
is need at concert times, class trips, before all holidays, class parties,
National Education week, parent conferences days and recreational sporting
events held by the Hampton Township Recreation Department.
Some relief will be gained when the township completes the roadway to the upper
field.
Anticipated cost for additional parking would be $75,000 and could be
accomplished over a period of three years. For a small additional fee,
directional lighting fixtures in the front parking lot could be installed to
better cover the new parking spaces.